Project readiness score

0%

0 verified of 16 applicable requirements

Mandatory setup gate

Blocked — 13 items not verified

  • • REQ-01 Project name, project ID and reporting date (Not Started)
  • • REQ-02 User access and approval hierarchy (Not Started)
  • • REQ-03 Approved scope and quantities for every activity (Not Started)
  • • REQ-04 Standard unit of measurement for every activity (Not Started)
  • • REQ-05 Approved baseline start and completion dates (Not Started)
  • • REQ-06 Work packages and unique activity IDs (Not Started)
  • • REQ-07 Tower register, route sections and location references (Not Started)
  • • REQ-08 Responsible contractor and site engineer (Not Started)
  • • REQ-09 Planned-versus-actual measurement method (Not Started)
  • • REQ-10 Defined progress-weighting methodology (Not Started)
  • • REQ-11 Evidence and verification requirements (Not Started)
  • • REQ-12 Activity dependencies, where relevant (Not Started)
  • • REQ-14 Reporting week and monthly reporting period (Not Started)

Draft data entry stays open. Official overall completion % is withheld until scope, baseline and measurement rules are verified.

1. Project Configuration

0/2 verified

2. Approved Baseline and Scope

0/3 verified

3. Work Breakdown Structure (WBS)

0/1 verified

4. Tower and Route Master

0/1 verified

5. Contractor and Responsible Engineer Register

0/1 verified

6. Progress Measurement Rules

0/2 verified

7. Evidence and Verification Rules

0/1 verified

8. Schedule and Activity Dependencies

0/1 verified

9. Quality, Safety and Approval Requirements

0/1 verified

10. Reporting Calendar

0/1 verified

11. Data Import and Source Reconciliation

0/1 verified

12. Project Readiness Checklist

0/1 verified

Setup gate · readiness

Project Control Setup & Data Readiness

Master data, approved targets, locations, contractor assignments, measurement and verification rules that must be configured before official progress reporting.

Readiness score = Verified applicable ÷ Total applicable × 100. A requirement counts only when Status is Verified AND Verification is Verified. Not Applicable is excluded only with a reason and an approver.

16 records
#Req. IDSectionRequirementDescriptionMandatory / ConditionalSetup gateResponsibleSource documentRequired byStatusVerificationOutstanding actionN/A reasonN/A approved byRemarks / attachment ref.
1REQ-011. Project ConfigurationProject name, project ID and reporting dateOfficial project name, unique project ID and current reporting date confirmed.MandatoryYes———Not StartedPending————
2REQ-021. Project ConfigurationUser access and approval hierarchyRoles (PM, planning, site, contractor, QA/QC, safety, viewer) and approval chain defined.MandatoryYes———Not StartedPending————
3REQ-032. Approved Baseline and ScopeApproved scope and quantities for every activityEach activity has an approved scope quantity from the contract / BOQ.MandatoryYes———Not StartedPending————
4REQ-042. Approved Baseline and ScopeStandard unit of measurement for every activityNos, km, set, lot etc. fixed per activity; no mixed units.MandatoryYes———Not StartedPending————
5REQ-052. Approved Baseline and ScopeApproved baseline start and completion datesBaseline schedule approved and frozen; revisions only by authorised users.MandatoryYes———Not StartedPending————
6REQ-063. Work Breakdown Structure (WBS)Work packages and unique activity IDsPackages 1–3 broken down into activities with unique IDs.MandatoryYes———Not StartedPending————
7REQ-074. Tower and Route MasterTower register, route sections and location referencesT1–T34, Parewar register, cable chainages and GSS locations defined.MandatoryYes———Not StartedPending————
8REQ-085. Contractor and Responsible Engineer RegisterResponsible contractor and site engineerEvery activity assigned to a contractor and a responsible engineer.MandatoryYes———Not StartedPending————
9REQ-096. Progress Measurement RulesPlanned-versus-actual measurement methodHow quantities are measured and planned curves derived.MandatoryYes———Not StartedPending————
10REQ-106. Progress Measurement RulesDefined progress-weighting methodologyActivity weights per package documented and reconciled to 100%.MandatoryYes———Not StartedPending————
11REQ-117. Evidence and Verification RulesEvidence and verification requirementsMandatory evidence per activity type configured and approved.MandatoryYes———Not StartedPending————
12REQ-128. Schedule and Activity DependenciesActivity dependencies, where relevantPredecessor/successor links for erection, stringing, testing, charging.MandatoryYes———Not StartedPending————
13REQ-139. Quality, Safety and Approval RequirementsQuality inspection & safety approval procedureITP, NCR closure and safety permit procedure adopted.ConditionalNo———Not StartedPending————
14REQ-1410. Reporting CalendarReporting week and monthly reporting periodWeek start day and monthly cut-off date fixed.MandatoryYes———Not StartedPending————
15REQ-1511. Data Import and Source ReconciliationImported slide data reconciled to approved recordsOct 2026 slide figures checked against measurement books.ConditionalNo———Not StartedPending————
16REQ-1612. Project Readiness ChecklistReadiness review signed offProject manager confirms setup is complete for official reporting.ConditionalNo———Not StartedPending————

Data quality

Exception register

Missing information, duplicates, conflicting quantities, mismatched units and overdue items found across registers.

RegisterRowException
Work packages16No approved scope
Work packages17No approved scope
Work packages18No approved scope
Work packages19No approved scope
Work packages20No unit of measurement · No approved scope
Work packages21No approved scope
Work packages22No unit of measurement · No approved scope
Work packages23No unit of measurement · No approved scope
Work packages24No unit of measurement · No approved scope
Work packages25No unit of measurement · No approved scope
Work packages26No unit of measurement · No approved scope
Work packages27No unit of measurement · No approved scope
Work packages28No unit of measurement · No approved scope
Work packages29No unit of measurement · No approved scope

Mandatory evidence per activity type

Evidence & verification rules

Records that must be attached before an entry can be approved. A photograph alone never certifies completion.

8 recordsNot started: 8
#Activity typeMandatory evidenceVerified byPhoto aloneRule status
1ExcavationLocation, measured length or tower ID, date, engineer verificationSite engineerNot sufficientNot started
2FoundationTower ID, inspection reference, concrete / test records, completion evidenceSite engineerNot sufficientNot started
3Tower erectionTower ID, installation status, inspection evidence, engineer confirmationSite engineerNot sufficientNot started
4Cable layingCable section, measured length, drum / cable ID, location, laying evidenceSite engineerNot sufficientNot started
5Conductor stringingLine section, measured progress, inspection records, verificationSite engineerNot sufficientNot started
6OPGWInstalled section, measured quantity, inspection evidenceSite engineerNot sufficientNot started
7Equipment installationEquipment ID, installation checklist, inspection recordSite engineerNot sufficientNot started
8Testing & commissioningApproved test records, signed checklists, applicable approvalsSite engineerNot sufficientNot started